How to successfully add a production simulation to your hiring process

Written by Connie Gentry, Consulting Associate
Previously published by PSI Talent Management or Cubiks, prior to becoming Talogy.

As selection systems and employer’s hiring needs continue to evolve, pre-employment tools such as realistic job previews and hands-on work simulations are becoming more prevalent. This is a trend that we especially tend to see in the manufacturing sector. Exercises or “production simulations” allow employers to get a concrete measure of a candidate’s ability to effectively perform the same type of tasks that they would be performing on the job.

Having been involved in the development and design of many custom production simulations, PSI Project Consultant, Eli Castruita, knows firsthand the amount of planning, resources, and costs that go into making an effective production simulation. Below, Eli has outlined 5 essential steps that employers should consider when contemplating the addition of a production simulation to their hiring process.

1) Conduct a thorough job analysis

It is not only critical to the success of a production simulation, but also for legal defensibility, that you thoroughly conduct a job analysis for the target position.

  • What are the knowledge, skills, and abilities necessary to perform the job?
  • Job analysis activities help uncover and often “debunk” misperceptions that managers sometimes have about what is really important to the job and what is not.
  • Because building out the actual simulation is a custom design process, it is essential to clearly identify what competencies are being measured.

2) Identify an internal champion early on

Just as with any project or initiative, it is extremely beneficial to have another internal resource to help champion the production simulation.

  • Do you have an influential internal champion who can persuade the floor?
  • Production simulations can be costly to build, so having another internal champion to help promote the ROI and end results is critical.
  • There will inevitably be “hiccups” as the project unfolds and your champion can also serve to help keep things running smoothly, manage key stakeholders’ expectations, and work with you to ensure success.

3) Determine budgeting and production simulation scope and scale

Typically, the main questions on everyone’s mind are how much it will cost to build a production simulation and what the scope and scale of the space needed to facilitate the simulation will be.

  • The costs for building a production simulation typically run into six figure ranges.
  • In scoping out specific needs, it’s important to determine how many separate stations are needed. For example, depending on candidate volume, you may want 9-12 stations through which multiple candidates can be processed and evaluated simultaneously. In this case, your company may be hiring for assembly, manufacturing and logistics positions, and a candidate would go through a station for each one of those work functions.
  • Costs for either renting a building or utilizing onsite space at a presently owned facility should also be researched and factored into the budget. Locations should include internet installation and meet all of the area’s current building and zoning codes.
  • Discussions surrounding the scoring of the production simulation should also be held to determine if the data needs transferred from one applicant tracking system (ATS) to another, and any costs that may also be involved from a technical perspective.
  • In addition to budgeting, a project team, detailed project plan, and regular weekly calls should be established.

4) Clearly define roles and responsibilities

A well-defined project plan should clearly spec out who is taking the lead and accountability for specific roles and responsibilities.

  • Who is responsible for ordering materials? Do they need to be purchased or do you already have the materials onsite?
  • Who is responsible for the actual hands-on build and testing of the equipment?
  • Consider aspects that may require a high volume of repeated movements and what effect that will have on the equipment.
  • Internal maintenance of the equipment should be built into the project plan and the budget.
  • Who will facilitate the production simulation? Will internal resources be available to facilitate it or will you need to contract that part of the process?

5) Ongoing monitoring of pass rates and checking for adverse impact

After the production simulation is officially launched, ongoing monitoring should take place to review pass rates and to ensure that measures are taken to reduce adverse impact.

  • Do the pass rates allow the client a high enough volume of candidates to fill positions?
  • Does it appear that the scoring could be made more stringent to filter out more individuals?
  • How does it factor into the big picture selection process?
  • Are there indicators of adverse impact? If so, what can be done to the scoring to reduce or eliminate it and not affect the utility and validity of the process?
  • Are there steps in the process, instructions, or even changes to a physical piece of equipment that need to be made?

There are many detailed steps and considerations that must go into making a sound and legally defensible production simulation, but the value to the overall selection process can be a great addition. Production simulations promote a high degree of face validity with candidates who recognize that they are truly being evaluated against specific movements, skills, and abilities that they would be doing everyday on the job. Employers are then able to easily screen out those individuals who cannot perform the job relevant skills.

Guide to the modern manufacturing employee

Preparing for the next generation of manufacturing employees

As a new generation replaces its predecessor, workplaces will change. How should your organization prepare to attract and retain the millennial workforce in manufacturing jobs?

In this guide you’ll learn:
 

  • How to attract millennial talent and close the skills gap
  • Master the art of managing millennials in manufacturing jobs
  • What’s next? A look into Generation Z
Download Now
preparing for the next generation a guide to the modern manufacturing employee cta advice guide cover
Decoration